OPTIMASI PRODUKSI PADA PENAMBANGAN BATUBARA DENGAN METODE ANTRIAN (STUDI KASUS PADA PERTAMBANGAN AREA SAMARINDA, KALTIM)

Authors

  • Alloysius Vendhi Prasmoro Program Studi Teknik Industri, Fakultas Teknik Universitas Bhayangkara Jakarta Raya

Keywords:

production optimize, waiting time, queuing, production cost, cycle time

Abstract

Coal mining business is now faced with various challenges such as export restrictions policy, an increase in value added products, and the decline in market prices of products. To be able to compete, mining companies are expected to increase productivity and efficiency and make continuous improvements in the production process. The purpose of this study was to optimize the production of coal mining in the context of the efficient use of equipment using queueing methode. The research location is in the area of ​​the mining concession contractor in October-November 2015. Production equipment used backhoe excavator is 5 units and 32 units of dump trucks. The simulation results the queuing method generated by the method optimal dump truck needs 25 units. The results of production optimization with queueing method produced mining productivity of 1,208 BCM of overburden per hour with the optimum cost of $ 0909 / BCM.

References

1. Alkass, S., Moslamani, K, & Alhussein, M. A Computer Model For Selecting Equipment For Earthmoving operations Using Queueing Theory. Proceeding Construction Information Department of Building, Civil and Environtmental Engineering, pp 78-83, Concordia University, Montreal. Canada, 2003
2. APBI. Industri Pertambangan Batubara Indonesia. http://www.apbi-icma.org. 2012
3. Burt, N, An Optimisation Approach to Materials Handling in Surface Mines. Thesis. Curtin University of Technology. Perth, 2008
4. Cetin, Necmettin, Open Pit Truck / Shovel Haulage System Simulation. Thesis. Graduate School Of Natural and Applied Science of Middle East Technical University. Ankara, 2004
5. Choudhary, R.P. Optimization of Load-Haul-Dump Mining System by OEE and Match Factor for Surface Mining. International Journal of Applied Engineering and Technology, 5, pp 96-102, 2015
6. Coronado, V.. Optimization of The Haulage Cycle Model for Open Pit Mining Using A Discrete Event Simulator and A Context Based Alert. Thesis. Department of Mining Geological and Geophysical Engineering. The University of Arizona. Arizona, 2014
7. Mohutsiwa & Musingwini. Parametric Estimation of Capital Costs for Establishing a Coal Mine : South Africa Case Study. The Journal of The Southern African Institute of Mining and Metalurgy, pp 789 – 797, 2015
8. May, M, Application of Queuing Theory for Open Pit Truck/Shovel Haulage Systems. Thesis. Virginia Polytechnic Institute and State University. Blacksburg, 2012
9. Noor, I. Analisa Penentuan Waktu Baku untuk Mempersingkat Proses Pelayanan Bongkar Muat di Pelabuhan Trisakti Banjarmasin. Jurnal INTEKNA, No. 2, (2011), pp 171-177, 2011
10. Sujatmiko, D, Analisis Produktivitas Alat Berat Studi Kasus Proyek Pembangunan PLTU Talaud 2 x 3 MW Sulawesi Utara. Tugas Akhir. Universitas Gadjah Mada. Yogyakarta, 2015

Downloads

Published

2016-09-15

How to Cite

Prasmoro, A. V. (2016). OPTIMASI PRODUKSI PADA PENAMBANGAN BATUBARA DENGAN METODE ANTRIAN (STUDI KASUS PADA PERTAMBANGAN AREA SAMARINDA, KALTIM). Jurnal Sains & Teknologi Fakultas Teknik Universitas Darma Persada, 6(1), 31–41. Retrieved from https://unsada.e-journal.id/jst/article/view/290