KERANGKA PERENCANAAN KEBUTUHAN KAPASITAS UNTUK MENGUJI KELAYAKAN RENCANA PRODUKSI
DOI:
https://doi.org/10.70746/jstunsada.v2i1.397Keywords:
RCCP, CRP, RPPAbstract
Capacity is maximum production rate which could be achieved by a production facility. To calculate capacity requircment to meet production plan, production schedule or material
requrement plan, it could be use Resource Requiremnt Planning (RRP), Rough Cut Capacity Planning (RCCP) or Capacity Requirement Planning (CRP). RRP is for long term planning, RCCP for medium term, and the last for short and detail one.
References
1. Bedworth, David D; Bailey, James E Bailey, lntegrated Production Controlsystems, John Wiley & sons New York, 1987
2. Elsayed EA, BoucherTo, Analysis and Controlof Production systems, Prentice Hall Intemational, Inc, New Jersey, 1994
3. Fogarty, Blackstone, Hoffmann, Production and lnventory Mangement, South Westem publishing Co. Cincinnati,1991
4. Groover, Mikell P, Automation, Production Systems, and Computer lntegrated Manufacturing, Prentice Hall lnternational, Inc, New Jersey, 1987
5. Haryanto, Daeng, Analisa Kebutuhan Kapasitas untuk Menyeimbangkan Beban Kerja Produksi Tail Light type 3 KA-H4700 di PT X, tugas akhir, Fakultas Teknik Universitas Darma Persada, 2003, tidak diterbitkan
6. Kusiak, Andrew, lntelligent Manufacturing Systems, Prentice Hall lntemational, lnc, New Jersey, 1990.
7. Tetsine, Richard J, Production/Operation Management : Concept, Structure, and Analysis, Prentice Hall, New Jersey, 1985
8. Vincent, Gaespersz, "Productlin Planning and lnventory Control", Gramedia Pustaka Utama, Jakarta, 1998
9. Walter E Goddard, Principle of capacity planning, BPICS Control June/July, 1986
2. Elsayed EA, BoucherTo, Analysis and Controlof Production systems, Prentice Hall Intemational, Inc, New Jersey, 1994
3. Fogarty, Blackstone, Hoffmann, Production and lnventory Mangement, South Westem publishing Co. Cincinnati,1991
4. Groover, Mikell P, Automation, Production Systems, and Computer lntegrated Manufacturing, Prentice Hall lnternational, Inc, New Jersey, 1987
5. Haryanto, Daeng, Analisa Kebutuhan Kapasitas untuk Menyeimbangkan Beban Kerja Produksi Tail Light type 3 KA-H4700 di PT X, tugas akhir, Fakultas Teknik Universitas Darma Persada, 2003, tidak diterbitkan
6. Kusiak, Andrew, lntelligent Manufacturing Systems, Prentice Hall lntemational, lnc, New Jersey, 1990.
7. Tetsine, Richard J, Production/Operation Management : Concept, Structure, and Analysis, Prentice Hall, New Jersey, 1985
8. Vincent, Gaespersz, "Productlin Planning and lnventory Control", Gramedia Pustaka Utama, Jakarta, 1998
9. Walter E Goddard, Principle of capacity planning, BPICS Control June/July, 1986
Downloads
Published
2012-03-15
How to Cite
Rahman, H. N. (2012). KERANGKA PERENCANAAN KEBUTUHAN KAPASITAS UNTUK MENGUJI KELAYAKAN RENCANA PRODUKSI. Jurnal Sains & Teknologi Fakultas Teknik Universitas Darma Persada, 2(1), 25–32. https://doi.org/10.70746/jstunsada.v2i1.397
Issue
Section
Articles
License
Copyright